ISO 9001 CERTIFIED • 30+ COUNTRIES

High-Pressure Sand Flushing Unit
for Efficient Oilfield Well Cleanout

Engineered for Performance. Built for the Field. Trusted by Operators Worldwide. Restore production faster with our mobile, self-contained sand flushing equipment.

Watch How It Works
Tel/WhatsApp: +86 189 3767 6920
ISO 9001:2015 Certified
30+ Countries
20+ Years Experience
API Standards Compliant
OUR LEGACY

About Vance Petro — Your Trusted Partner in Oilfield Sand Removal Solutions

Henan Vance Petroleum Machinery Co., Ltd. (Vance Petro) is a professional oilfield equipment manufacturer headquartered in Puyang City, Henan Province, China — the heart of China's petroleum machinery industry.

With over two decades of engineering experience in the oil and gas sector, Vance Petro has earned a reputation for delivering high-quality, field-proven equipment to operators across the globe.

Our flagship sand flushing unit is designed, manufactured, and tested under our ISO 9001:2015 certified quality management system, ensuring consistent performance in the harshest environments.

30+ Countries
Global Deployments
20+ Years
Petroleum Machinery Expertise
ISO 9001:2015 Quality Management System Certificate — Henan Vance Petroleum Machinery Co., Ltd.
ISO 9001:2015 Certified
Every unit is factory-tested and certified for quality and performance.
PROFESSIONAL OILFIELD EQUIPMENT

Sand Flushing Unit — Professional Oilfield Sand Cleanout Equipment

Fully self-contained, truck-mounted solution for rapid, cost-effective well sand removal.

Vance Petro sand flushing unit — left side view showing high-pressure pumping system and mobile truck chassis
High-Pressure Triplex Plunger Pump
35 MPa (5,076 psi) maximum working pressure with sustained high-flow performance.
Mobile Truck-Mounted Design
Fully road-legal, self-propelled on heavy-duty commercial chassis. Ready to deploy in hours.
Coiled Tubing Compatible
Seamlessly integrates with coiled tubing for horizontal and extended-reach wells.

Key Product Features

Powerful Diesel Engine — Cummins or equivalent, reliable in extreme conditions.
Integrated Fluid Tank System — 8–12 m³ onboard capacity for sustained operations.
Centralized Control Console — Operator-friendly panel with pressure gauges, flow meters, and emergency shutdown.
Comprehensive Safety Systems — Pop-off valves, pressure relief, grounding, and API-standard connections.
Ready to restore production?

Sand Flushing Unit — Technical Specifications

Standard configuration. Custom options available for higher pressure, different chassis, or extreme environments.

Unit TypeTruck-Mounted Sand Flushing Unit (Self-Propelled)
Pump TypeTriplex Plunger Pump (Single-Acting, Horizontal)
Maximum Working Pressure35 MPa (5,076 psi)
Maximum Flow Rate600 L/min (158.5 GPM)
Rated Horsepower250–350 HP (configurable)
EngineCummins Diesel Engine (Tier 2 / Tier 3 compliant)
Fluid Tank Capacity8 m³ – 12 m³ (2,113 – 3,170 US gallons)
Operating Temperature−20°C to +55°C (−4°F to +131°F)
Truck ChassisHeavy-duty 6×4 or 6×6 commercial chassis
Safety FeaturesPop-off valve, emergency shutdown, pressure relief, grounding system
CertificationISO 9001:2015, API Standards Compliance
Warranty12 months or 2,000 operating hours

How the Sand Flushing Unit Works

Step-by-step oilfield sand cleanout process — fast, safe, and highly effective.

1
Site Assessment & Mobilization
Review well data and mobilize the self-contained unit to the well site — ready to operate within hours.
2
Wellhead Connection & Rigging Up
Connect high-pressure lines to the wellhead and return flow line to the annulus. Pressure test all connections.
3
High-Pressure Pumping & Sand Displacement
Engage the triplex plunger pump. High-velocity fluid jet dislodges and suspends sand for circulation out of the wellbore.
4
Reverse Circulation & Sand Recovery
Sand-laden fluid returns to surface through the annulus and is directed to solids control equipment for separation.
5
Progressive Cleanout & Final Verification
Advance work string as sand is removed. Perform final high-volume flush until returns are clean. Rig down and demobilize.
Typical cleanout time: 4–12 hours per well (vs. 2–5 days with workover rig)

Applications — Where Our Sand Flushing Unit Delivers Results

🛢️
Onshore Oil & Gas Wells
Mature fields with sand production causing wellbore fill and reduced flow rates.
🪨
Shale & Horizontal Wells
Proppant flowback and sand accumulation in laterals — cleaned with coiled tubing integration.
🔧
Workover & Completion Operations
Pre-intervention cleanout before installing pumps, packers, or running new completions.
💉
Injection & Disposal Wells
Maintain injectivity by removing sand accumulation in water/gas injection wells.
🌍
Geothermal Wells
Restore thermal output by clearing mineral scale and sand in geothermal systems.
📡
Well Testing & Evaluation
Ensure accurate test data with a clean wellbore before pressure and flow measurements.

10 Reasons Operators Choose the Vance Petro Sand Flushing Unit

Rapid Mobilization
Self-contained truck-mounted unit — on site and operational in hours, not days.
60–80% Cost Savings
Dramatically lower than workover rig operations while delivering equivalent results.
35 MPa High-Pressure Performance
Handles compacted sand fills in deep wells up to 4,000+ meters.
Extreme Environment Ready
Operates reliably from −20°C to +55°C with optional winterization packages.
Coiled Tubing Compatible
Ideal for horizontal and extended-reach wells when paired with coiled tubing.
Comprehensive Safety Systems
Pop-off valves, pressure relief, emergency shutdown, and API-standard connections.

Why Choose Vance Petro as Your Sand Flushing Partner?

20+ Years of Petroleum Machinery Expertise
Specialized experience in designing and manufacturing oilfield equipment in China's petroleum capital.
ISO 9001:2015 Certified Quality
Rigorous quality management from raw material inspection to final factory acceptance testing.
Trusted in 30+ Countries
Proven performance in the Middle East, Central Asia, Africa, Southeast Asia, and South America.
Complete After-Sales Support
24/7 technical hotline, rapid spare parts supply, on-site commissioning, and operator training.

Real Results from Real Oilfields

🇮🇶 MIDDLE EAST
Mature Onshore Field — 40+ Wells Cleaned
Before
3–5 days per well • $45,000+ cost
After Vance Petro Unit
6–8 hours per well • 75% cost reduction
Deployed two units in coordinated campaign. All 40+ wells cleaned in under 8 weeks. Average production increase of 35 bbl/day per well. ROI achieved in 3 months.
"The Vance Petro sand flushing units transformed our well maintenance program."
🇰🇿 CENTRAL ASIA
Horizontal Shale Wells — Proppant Flowback Cleanout
Challenge
Horizontal laterals with 40–60% production loss from proppant flowback
Result
85–95% production restored • 30+ wells successfully treated
Custom configuration with chemical injection pump for friction reducers. Integrated seamlessly with client's coiled tubing unit. Second unit ordered within 6 months.
🇳🇬 WEST AFRICA
National Oil Company — 180+ Wells in 12 Months
Challenge
200+ well backlog • $2M/month deferred production
Result
180+ wells cleaned • 6,500+ bbl/day recovered • 92% equipment uptime
Fleet of four units delivered with winterization and tropical climate upgrades. Client ordered two additional units plus 24-month spare parts package.

Frequently Asked Questions

What is the maximum pressure and flow rate?
Standard configuration delivers 35 MPa (5,076 psi) maximum working pressure and 600 L/min (158.5 GPM) flow rate. Custom higher-pressure configurations are available.
Can it be used with coiled tubing?
Yes. Fully compatible with coiled tubing for horizontal and extended-reach wells. Optional adapter kits and chemical injection pumps available.
How long does a typical cleanout take?
4–12 hours per well depending on depth and sand volume — dramatically faster than 2–5 days with a conventional workover rig.
What is the lead time?
Standard units: 45–60 working days. Custom configurations: 60–90 working days. We provide regular progress updates with photos.
What after-sales support do you provide?
24/7 technical hotline, rapid global spare parts shipping, on-site commissioning, operator training, and preventive maintenance programs.
READY TO RESTORE PRODUCTION?

Get Your Custom Sand Flushing Solution Today

Factory-direct pricing • 48-hour response • Global support

No obligation • 24-hour response guaranteed
📞 Tel / WhatsApp
+86 189 3767 6920
📧 Email
info@vancepetro.com
🌐 Main Website
vancepetro.com
Vance Petroleum Logo
Henan Vance Petroleum
Machinery Co., Ltd.

Hello! How can we help you today?

Professional Oilfield Equipment Manufacturer

Business Hours: Mon–Fri 8:00 AM – 6:00 PM (Beijing Time)